No two homes are the same and to make sure the GreenHeat System is right for you go through this quick checklist and then read or pass on the installation charts to your builder, plumber or architect.
Mains Gas or LPG gas
Underfloor Access of 400mm (for EXISTING properties)
OR
Access in Ceiling OR Underfloor (for NEW properties only)
Double External Powerpoint within 1 metre of Hot water unit position
Water line within 1 meter of Hot water unit position
Gas line (25.4mm to 32mm) within 1 meter of Hot water unit position
Please download and print off the following attachement